Residential development on the border to Allschwil with apartment block along the street and atrium houses in the inner courtyard.

Neuweilerhof residential development

Basel
Residential
Text Link

Residential development on the border to Allschwil with apartment block along the street and atrium houses in the inner courtyard.

  • Client
  • Blaser Projekte GmbH
    Blaser Projekte GmbH
  • Location
  • Basel
  • Mandate form
  • General planner
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • New building
  • Duration
  • 06.2010
    —heute
    —08.2012
    0 Days
Neuweilerhof residential development

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Neuweilerhof residential development

The 'NeuWeilerHof' residential development at Neuweilerstrasse 91/93 is divided into the residential building along Neuweilerstrasse and the three atrium houses in the inner courtyard. The residential building, consisting of three full storeys and an attic storey, comprises spacious and bright 4.5 and 5.5-room flats, as well as a 5.5-room attic flat with a large south-facing roof terrace. The living spaces impress with a variety of views to the outside and within the flat, good furnishing options and separate day and night zones.

The atrium houses have two floors. They are primarily south-facing, with the outer houses orientated on three sides, creating generous views. While the upper floor has a strong connection to the outside, the ground floor is orientated inwards, towards the heart of the house, the atrium. Clear forms, large window fronts and plenty of light dominate the interior of the houses.

Project information

  • GV SIA 416 m3
  • 7'739
  • GF SIA 416 m2
  • 2'528
  • Nutzfläche m2
  • 1'687
  • Fotografie
  • Michael Fritschi

Partner

  • Statik
  • Jauslin Stebler AG
  • Elektro
  • Gugliuzzo Engineering GmbH
  • HLKKS
  • Wenger + Ott
  • Bauphysik
  • Ehrsam Bauphysik AG
  • Landschaft
  • Jacob Planung

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

The success of the competition in collaboration with Grafton Architects from Ireland has laid the foundation stone for the future university quarter.

Dreispitz university quarter study contract

The success of the competition in collaboration with Grafton Architects from Ireland has laid the foundation stone for the future university quarter.

Tenant fit-out for Credit Suisse at the Liestal railway station.

Credit Suisse Liestal

Tenant fit-out for Credit Suisse at the Liestal railway station.

Conversion of existing cellular offices into an open multi-space landscape for the chemical company Huntsman.

Huntsman Advanced Materials

Conversion of existing cellular offices into an open multi-space landscape for the chemical company Huntsman.

Conversion of the listed market hall site from 1928/29 with domed building and peripheral buildings.

Market hall complex

Conversion of the listed market hall site from 1928/29 with domed building and peripheral buildings.

Enlargement of an existing Masionette flat by an additional storey.

Flat Offenburgerstrasse

Enlargement of an existing Masionette flat by an additional storey.

Communication zone with wooden seating

Bright Peak Thera­­peutics

Installation of laboratory and office space for the young biotechnology company Bright Peak Therarpeutics on the Main Campus in Allschwil.

Since summer 2016, you can complete a full workout in 20 minutes using the new EMS (electronic muscle stimulation) training programme at Grenzacherstrasse 62 in Basel.

Bionic Training

Since summer 2016, you can complete a full workout in 20 minutes using the new EMS (electronic muscle stimulation) training programme at Grenzacherstrasse 62 in Basel.

The former start-up company Piqur moves into its own rental space in Stücki Park Basel.

Piqur

The former start-up company Piqur moves into its own rental space in Stücki Park Basel.

Complete refurbishment of Credit Suisse building with bank branch on the ground floor and offices, residential units on the upper floors.

Credit Suisse Claraplatz

Complete refurbishment of Credit Suisse building with bank branch on the ground floor and offices, residential units on the upper floors.

Installation of the second company site of Lonza AG at the Lonza Tower in Basel.

Lonza AG expansion

Installation of the second company site of Lonza AG at the Lonza Tower in Basel.