Residential development on the border to Allschwil with apartment block along the street and atrium houses in the inner courtyard.

Neuweilerhof residential development

Basel
Residential
Text Link

Residential development on the border to Allschwil with apartment block along the street and atrium houses in the inner courtyard.

  • Client
  • Blaser Projekte GmbH
    Blaser Projekte GmbH
  • Location
  • Basel
  • Mandate form
  • Architecture
    General planning
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • New building
  • Duration
  • 06.2010
    —heute
    —08.2012
    0 Days
Neuweilerhof residential development

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Neuweilerhof residential development

The 'NeuWeilerHof' residential development at Neuweilerstrasse 91/93 is divided into the residential building along Neuweilerstrasse and the three atrium houses in the inner courtyard. The residential building, consisting of three full storeys and an attic storey, comprises spacious and bright 4.5 and 5.5-room flats, as well as a 5.5-room attic flat with a large south-facing roof terrace. The living spaces impress with a variety of views to the outside and within the flat, good furnishing options and separate day and night zones.

The atrium houses have two floors. They are primarily south-facing, with the outer houses orientated on three sides, creating generous views. While the upper floor has a strong connection to the outside, the ground floor is orientated inwards, towards the heart of the house, the atrium. Clear forms, large window fronts and plenty of light dominate the interior of the houses.

Project information

  • GV SIA 416 m3
  • 7'739
  • GF SIA 416 m2
  • 2'528
  • Nutzfläche m2
  • 1'687
  • Fotografie
  • Michael Fritschi

Fachplanung

  • Statik
  • Jauslin Stebler AG
  • Elektro
  • Gugliuzzo Engineering GmbH
  • HLKKS
  • Wenger + Ott
  • Bauphysik
  • Ehrsam Bauphysik AG
  • Landschaft
  • Jacob Planung

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Installation of a multi-space office in a square floor plan with a formerly dark centre zone.

Novartis Campus WSJ-360 5. OG

Installation of a multi-space office in a square floor plan with a formerly dark centre zone.

Expansion of production areas and offices at the headquarters of Medartis AG in Stücki Park in Basel.

Medartis production expansion

Expansion of production areas and offices at the headquarters of Medartis AG in Stücki Park in Basel.

View of the reception desk

Medical practice OrthoPlusBasel

Installation of a medical practice for orthopaedics, traumatology and rheumatology in a newly renovated commercial building.

New replacement building in the popular Bachletten neighbourhood, interspersed with backyards.

MFH Leimenstrasse

New replacement building in the popular Bachletten neighbourhood, interspersed with backyards.

Conversion of former cubicle offices into a bright open-plan office with kitchen area and meeting room.

Bau 860

Conversion of former cubicle offices into a bright open-plan office with kitchen area and meeting room.

Installation of a technology park for start-up companies in Stücki Park Basel.

Technology Park I

Installation of a technology park for start-up companies in Stücki Park Basel.

Construction of a new day care centre in Stein (AG) for the children of Novartis employees.

Day care centre Stein

Construction of a new day care centre in Stein (AG) for the children of Novartis employees.

Turnhalle

Building trade Vocational School

Replacement building for the Zürich Vocational School for the Construction Industry due to the sharp increase in student numbers.

Renovation of the building envelope of an apartment block with enlargement of the balcony areas.

MFH C.F Meyer-Strasse 54

Renovation of the building envelope of an apartment block with enlargement of the balcony areas.

Study contract for an extension to the Fondation Beyeler in Riehen in the neighbouring Iselin-Weber Park.

Competition Beyeler Museum

Study contract for an extension to the Fondation Beyeler in Riehen in the neighbouring Iselin-Weber Park.