Integration of a company specialising in biopharmaceuticals into the Main Campus.

T3 Pharmaceuticals

Allschwil
Laboratory/Research
Text Link
Office/Administration
Text Link

Integration of a company specialising in biopharmaceuticals into the Main Campus.

  • Client
  • T3 Pharmaceuticals AG
    T3 Pharmaceuticals AG
  • Location
  • Allschwil
  • Mandate form
  • Architecture
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Tenant fit out
  • Duration
  • 11.2021
    —heute
    —12.2022
    0 Days
T3 Pharmaceuticals

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

T3 Pharmaceuticals

The biopharmaceutical company T3 Pharmaceuticals specialises in the development of bacterial cancer therapies. Despite significant progress in classical therapies, there is still a high demand for novel and innovative drugs for the treatment of cancer. T3 Pharmaceuticals is dedicated to filling this gap by developing highly specific and efficient treatments using live bacteria.

Blaser Architekten, together with the general contractor Senn Ressources AG, was responsible for planning the rental space on the 4th floor of the Main Campus. We also supported the implementation planning with the specialist planning team provided by the general contractor. Laboratories for analysis and cell culture, offices and a lounge with a kitchenette were installed.

Project information

  • GV SIA 416 m3
  • 1'869
  • GF SIA 416 m2
  • 455
  • Nutzfläche m2
  • 446
  • Nachhaltigkeit
  • LEED Gold
  • Totalunternehmer  
  • Senn Ressources AG
  • Fotografie, Video
  • Michael Fritschi

Fachplanung

  • Elektro  
  • Senn Technology AG
  • HLKK  
  • Aicher, De Martin, Zweng AG
  • Akustik  
  • Kopitsis Bauphysik AG    
  • Brandschutz  
  • Gruner AG       
  • Laborplaner  
  • Laborplaner Tonelli AG    
Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Installation of a multi-space office in a square floor plan with a formerly dark centre zone.

Novartis Campus WSJ-360 5. OG

Installation of a multi-space office in a square floor plan with a formerly dark centre zone.

Conversion of former cubicle offices into a bright open-plan office with kitchen area and meeting room.

Bau 860

Conversion of former cubicle offices into a bright open-plan office with kitchen area and meeting room.

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

MFH Friedensgasse

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

Two-stage refurbishment and upgrading of a detached house from the 1970s.

SFH Binningen

Two-stage refurbishment and upgrading of a detached house from the 1970s.

Installation of open space offices for a clinical research organisation in the premises of the old stock exchange in Basel.

Alte Börse

Installation of open space offices for a clinical research organisation in the premises of the old stock exchange in Basel.

New location for the SSEF (Swiss Gemmological Institute) with spacious, state-of-the-art laboratories.

Stiftung Schweizer­isches Gemmolo­gisches Institut

New location for the SSEF (Swiss Gemmological Institute) with spacious, state-of-the-art laboratories.

Installation of production areas and offices in the entire House E in Stücki Park for the medical technology company Medartis.

Medartis

Installation of production areas and offices in the entire House E in Stücki Park for the medical technology company Medartis.

Refurbishment of the front and rear buildings and installation of new flats in a building complex from the 1960s.

MFH Missionsstrasse

Refurbishment of the front and rear buildings and installation of new flats in a building complex from the 1960s.

Installation of the second company site of Lonza AG at the Lonza Tower in Basel.

Lonza AG

Installation of the second company site of Lonza AG at the Lonza Tower in Basel.

Project competition for the extension of the Kunstmuseum Basel in a team with Rapp Arcoplan and the design architect Tadao Ando.

Competition Art Museum

Project competition for the extension of the Kunstmuseum Basel in a team with Rapp Arcoplan and the design architect Tadao Ando.