The success of the competition in collaboration with Grafton Architects from Ireland has laid the foundation stone for the future university quarter.

Dreispitz university quarter study contract

Münchenstein
Education
Text Link
Leisure/Culture
Text Link

The success of the competition in collaboration with Grafton Architects from Ireland has laid the foundation stone for the future university quarter.

  • Client
  • Christoph Merian Stiftung und Swiss Prime Site Immobilien
    Christoph Merian Stiftung und Swiss Prime Site Immobilien
  • Location
  • Münchenstein
  • Mandate form
  • General planner
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • New building
    Study
    Competition
  • Duration
  • 07.2021
    —heute
    —01.2022
    0 Days
Dreispitz university quarter study contract

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Dreispitz university quarter study contract

A new university quarter is to be built on the Dreispitz. It will be home to the Faculty of Law and the Faculty of Economics in the future.

In June 2021, the landowner CMS and Swiss Prime Site Immobilien, as the participating building rights holder, invited tenders for an urban planning study contract to develop the new university quarter in Dreispitz. The primary aim is to create an innovative and attractive university education campus. However, other uses such as housing, neighbourhood amenities for daily needs, restaurants, childcare facilities, leisure facilities and businesses are also to be established. A building for the Swiss Circus Centre Basel is also planned.

Together with the university, a sustainable, attractive and lively neighbourhood with high-quality and climate-relevant outdoor and green spaces is to be created. Together with the FHNW School of Art and Design and the planned FHNW School of Business, the new university site will form an actual education cluster on the Dreispitz.

The assessment panel was unanimously in favour of considering the proposals of the team led by Grafton Architects/Blaser Architekten in the study parameters as the basis for further planning steps. What particularly impressed the assessment panel about this proposal was that the character of the Dreispitz was further developed and a continuous green area was planned. Existing structures should be reused wherever possible and the disused railway tracks should be incorporated. According to the report, the planning team presents an extremely intelligent, aesthetic and sustainable approach that deals with what is already there and responds to the current challenges of people- and climate-friendly urban development.

Further planning steps and building licence negotiations are now to be prepared on the basis of the study. The new university quarter is expected to be visible from 2030 and the building will be handed over to the University of Basel as its user.

Project information

  • GV SIA 416 m3
  • 312'498
  • GF SIA 416 m2
  • 84'911
  • Designarchitekt
  • Grafton Architects
  • Visualisierung
  • Grafton Architects

Fachplanung

  • Energie
  • Urban Systems Design
  • Landschaft
  • Westpol Landschaftsarchitektur

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Renovation of the building envelope of an apartment block with enlargement of the balcony areas.

MFH C.F Meyer-Strasse 54

Renovation of the building envelope of an apartment block with enlargement of the balcony areas.

Conversion and extension of a shop in the centre of Basel.

Boutique Interio

Conversion and extension of a shop in the centre of Basel.

Work table with children's toys

Front and rear building Austrasse 32

Remodelling of a former workshop building in the rear courtyard and usable space in the front building for Heime Auf Berg AG.

Credit Suisse in Reinach strengthened its presence on the newly designed village square.

Credit Suisse Reinach

Credit Suisse in Reinach strengthened its presence on the newly designed village square.

Conversion of a listed building with residential use on the ground floor.

Neubad residential and office building

Conversion of a listed building with residential use on the ground floor.

Data centre with external technical rooms for the Markant company in Offenburg.

Data centre Markant

Data centre with external technical rooms for the Markant company in Offenburg.

New replacement building in a quiet residential neighbourhood on Basel's Bruderholz.

MFH C.F Meyer-Strasse 43

New replacement building in a quiet residential neighbourhood on Basel's Bruderholz.

 Refurbishment of a commercial building in a central location in Basel with extension of use to a residential and commercial building.

Aeschenvorstadt residential and commercial building

Refurbishment of a commercial building in a central location in Basel with extension of use to a residential and commercial building.

Chemgineering's tenant change within the buildings of Spenglerpark Münchenstein.

Chemgineering

Chemgineering's tenant change within the buildings of Spenglerpark Münchenstein.

Refurbishment of a residential complex designed by architect Walter Senn in 1965.

MFH Birshöhe

Refurbishment of a residential complex designed by architect Walter Senn in 1965.