Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Temporary facilities at Klybeck health schools

Basel
Education
Text Link
Gastronomy
Text Link
Health
Text Link

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

  • Client
  • Rhystadt AG
    Rhystadt AG
  • Location
  • Basel
  • Mandate form
  • General planner
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Interior design
    Conversion/Renovation
  • Duration
  • 09.2020
    —heute
    —07.2021
    0 Days
Temporary facilities at Klybeck health schools

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Temporary facilities at Klybeck health schools

The BZG and BfG health schools of the cantons of Basel-Stadt and Baselland were located in the Spenglerpark buildings in Münchenstein. As a result of the complete renovation of these buildings, they were temporarily housed in five existing buildings on the Klybeck site. A total of approx. 20,000 m2 of temporary school space was created there for around 1,600 users.

Blaser Architekten worked as general planners for the landowner Rhystadt AG, Basel. We were also responsible for the tenant fit-outs, including relocation planning, IT and security.

The depth of penetration into the buildings varied greatly due to the different condition of the buildings and the user requirements. The spatial programme included the creation of various classrooms for frontal and studio teaching, exercise rooms, laboratories, administration and various recreation and social rooms. A fully functional ward was installed for the training of nursing staff so that students can fully simulate the nursing situation in hospitals.

Construction began in mid-November 2020 and the school opened on schedule at the beginning of August 2021, at the start of the new academic year.

Project information

  • GV SIA 416 m3
  • 125'100
  • GF SIA 416 m2
  • 32'766
  • Nutzfläche m2
  • 19'400
  • Fotografie
  • Michael Fritschi

Partner

  • Statik
  • Gruner Lüem AG
  • Elektro
  • Edeco AG
  • HLKK
  • herrmann & partner Energietechnik GmbH
  • Sanitär
  • Festa Engineering GmbH
  • Bauphysik/Akustik
  • Ehrsam Bauphysik AG
  • Landschaft
  • Jacob Planung
  • Schadstoffe
  • Carbotech AG
  • Brandschutz
  • Gruner AG
  • Laborplaner
  • Laborplaner Tonelli AG
Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Central service point for various services for employees on the Novartis Campus.

Novartis Campus WSJ-502 Shop Center

Central service point for various services for employees on the Novartis Campus.

Refurbishment of a high-quality restaurant with replacement extension in the village centre of Riehen.

Landgasthof Riehen

Refurbishment of a high-quality restaurant with replacement extension in the village centre of Riehen.

Renovation and refurbishment of an apartment block in occupied condition.

MFH Hardstrasse

Renovation and refurbishment of an apartment block in occupied condition.

Conversion of a commercial and apartment building into a spacious detached house.

SFH Riehen

Conversion of a commercial and apartment building into a spacious detached house.

Study to analyse the opportunities and risks of further industrial use of the Swissmetal site in Dornach.

Swissmetal site development

Study to analyse the opportunities and risks of further industrial use of the Swissmetal site in Dornach.

Expansion of the Basel Technology Park in Stücki Park.

Technology Park II

Expansion of the Basel Technology Park in Stücki Park.

New replacement building in the popular Bachletten neighbourhood, interspersed with backyards.

MFH Leimenstrasse

New replacement building in the popular Bachletten neighbourhood, interspersed with backyards.

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

MFH Mittlere Strasse

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

Installation of a technology park for start-up companies in Stücki Park Basel.

Technology Park I

Installation of a technology park for start-up companies in Stücki Park Basel.

A modern office interior, bright, with wood, which offers space for concentrated work alone or meetings in different group sizes.

SIP Switzerland Innovation Park

A modern office interior, bright, with wood, which offers space for concentrated work alone or meetings in different group sizes.