Modernisation with extension of use following successful neighbourhood planning procedure.

Residential and commercial buildings Unterdorf

Allschwil
Residential
Text Link

Modernisation with extension of use following successful neighbourhood planning procedure.

  • Client
  • Basler Versicherungen AG, ASSETIMMO
    Basler Versicherungen AG, ASSETIMMO
  • Location
  • Allschwil
  • Mandate form
  • Architecture
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Conversion/Renovation
  • Duration
  • 11.2009
    —heute
    —11.2011
    0 Days
Residential and commercial buildings Unterdorf

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

Residential and commercial buildings Unterdorf

Blaser Architekten AG brought about extensions to the use of the entire property owned by Assetimmo and Basler Versicherungen AG in a neighbourhood planning process from 2007-2010. This involved a total of four additional penthouse flats and the extension of the commercial space of the Credit Suisse bank branch on the ground floor of the Basler Versicherungen AG building. The realisation of the Assetimmo and Basler Versicherungen AG building projects and the refurbishment measures required due to the age of the building were realised and coordinated by Blaser Architekten AG from planning to execution. The flats were modernised while they were occupied.

The frontage was given a completely new look with its continuous, curtain-type parapet elements made of perforated, shiny gold aluminium sheet. A lift system was installed in the residential complex in connection with the addition of a storey to the roof on Spitzgartenweg - two flats and a flat extension with spacious roof terraces were created.

Project information

  • GV SIA 416 m3
  • 19'263
  • GF SIA 416 m2
  • 6'915
  • Nutzfläche m2
  • 4'398
  • Fotografie
  • Archiv Blaser Architekten AG

Technical Planning

  • Statik
  • Rapp Infra AG
  • Elektro
  • Scherler AG - Beratende Ingenieure
  • HLKKS
  • Festa Engineering GmbH
  • Bauphysik
  • Ehrsam Bauphysik AG

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Competition project for the Lüdin Area in Liestal in collaboration with Karpf Khalili Architects, New York.

Competition Lüdin Area

Competition project for the Lüdin Areal in Liestal in collaboration with Karpf Khalili Architects, New York.

Extension to a residential building from the 1950s in a unique location in Pfeffingen.

SFH Pfeffingen

Extension to a residential building from the 1950s in a unique location in Pfeffingen.

Refurbishment of a residential building with newly constructed duplex flats on the top floor.

MFH Burgunder­strasse

Refurbishment of a residential building with newly constructed duplex flats on the top floor.

Blaser Architekten / Butscher Architekten realised the office and laboratory building on the Novartis Campus as local architect for the design architect Rahul Mehrotra.

Novartis Campus WSJ-182

Blaser Architekten / Butscher Architekten realised the office and laboratory building on the Novartis Campus as local architect for the design architect Rahul Mehrotra.

Since summer 2016, you can complete a full workout in 20 minutes using the new EMS (electronic muscle stimulation) training programme at Grenzacherstrasse 62 in Basel.

Bionic Training

Since summer 2016, you can complete a full workout in 20 minutes using the new EMS (electronic muscle stimulation) training programme at Grenzacherstrasse 62 in Basel.

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Temporary facilities at Klybeck health schools

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Work table with children's toys

Rear building Austrasse

Remodelling of a former workshop building in the rear courtyard and usable space in the front building for Heime Auf Berg AG.

Two-stage study contract for the extension and refurbishment of the Bruderholz Cantonal Hospital.

Study contract for cantonal hospital

Two-stage study contract for the extension and refurbishment of the Bruderholz Cantonal Hospital.

Installation of production areas and offices in the entire House E in Stücki Park for the medical technology company Medartis.

Medartis

Installation of production areas and offices in the entire House E in Stücki Park for the medical technology company Medartis.

Interior view with bar and lounge area

Restaurant hundertpunkt

Revitalisation of the catering space of the hundertpunkt restaurant in Spenglerpark Münchenstein.