Refurbishment of a residential complex designed by architect Walter Senn in 1965.

MFH Birshöhe

Muttenz
Residential
Text Link

Refurbishment of a residential complex designed by architect Walter Senn in 1965.

  • Client
  • Schweizerische Bundesbahnen SBB Immobilien
    Schweizerische Bundesbahnen SBB Immobilien
  • Location
  • Muttenz
  • Mandate form
  • Architecture
    General planning
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Conversion/Renovation
  • Duration
  • 04.2005
    —heute
    —09.2007
    0 Days
MFH Birshöhe

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

MFH Birshöhe

Blaser Architekten were commissioned by SBB Immobilien to develop a construction project for the renovation of apartment blocks 91-95, with the aim of bringing the quality of living up to current rental flat standards by providing attractive and contemporary facilities.

The properties, built in 1965, were designed by architect Walter Senn as pure leca concrete buildings. The interior walls have a static function and so only on the attic floor were flats (5 1/2 rooms) realised. The remaining storeys are made up of 3 1/2 and 4 room flats. A total of 127 flats were renovated in three construction phases.

Project information

  • GV SIA 416 m3
  • 47'650
  • GF SIA 416 m2
  • 15'625
  • Nutzfläche m2
  • 10'414
  • Fotografie
  • Archiv Blaser Architekten AG

Technical Planning

  • Elektro
  • Schwarz + Partner AG
  • HLK
  • Advens AG
  • Sanitär
  • Haldemann Basel
  • Landschaft
  • Dipol Landschaftsarchitekten GmbH

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Primeo Energie

Primeo Energie

Refurbishment and Conversion of Primeo Office Space, Münchenstein – Reinterpreting Existing Work Environments.

Classroom

Limmattal Vocational School

New extension for the Limmattal cantonal school in Urdorf near Zürich due to the sharp rise in pupil numbers.

New replacement building with consistent floor plans and loft-like living character.

MFH Dornacher­strasse

New replacement building with consistent floor plans and loft-like living character.

Refurbishment of the front and rear buildings and installation of new flats in a building complex from the 1960s.

MFH Missionsstrasse

Refurbishment of the front and rear buildings and installation of new flats in a building complex from the 1960s.

Refurbishment of a commercial building in a central location in Basel with extension of use to a residential and commercial building.

Aeschenvorstadt residential and commercial building

Refurbishment of a commercial building in a central location in Basel with extension of use to a residential and commercial building.

Turnhalle

Building trade Vocational School

Replacement building for the Zürich Vocational School for the Construction Industry due to the sharp increase in student numbers.

The success of the competition in collaboration with Grafton Architects from Ireland has laid the foundation stone for the future university quarter.

Dreispitz university quarter study contract

The success of the competition in collaboration with Grafton Architects from Ireland has laid the foundation stone for the future university quarter.

Work table with children's toys

Rear building Austrasse

Remodelling of a former workshop building in the rear courtyard and usable space in the front building for Heime Auf Berg AG.

Competition for the clarification of future potentials and the development of the external space of EuroAirport Basel-Mulhouse.

EuroAirport rail link competition

Competition for the clarification of future potentials and the development of the external space of EuroAirport Basel-Mulhouse.

State-of-the-art operating unit for training purposes

Training center Medartis

Installation of state-of-the-art operating units as well as open office space and meeting zones for the International Bone Research Association (IBRA)