Installation of open space offices for a clinical research organisation in the premises of the old stock exchange in Basel.

Alte Börse

Basel
Office/Administration
Text Link

Installation of open space offices for a clinical research organisation in the premises of the old stock exchange in Basel.

  • Client
  • UBS Fund Management (Switzerland) AG
    UBS Fund Management (Switzerland) AG
  • Location
  • Basel
  • Mandate form
  • Architecture
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Tenant fit out
    Conversion/Renovation
  • Duration
  • 10.2017
    —heute
    —06.2018
    0 Days
Alte Börse

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

Alte Börse

Blaser Architekten were the architects responsible for the remodelling and tenant fit-out of the old stock exchange in Basel. MIAC AG (Medical Image Analysis Center), a clinical research organisation that works closely with the University of Basel and the University Hospital Basel, has now moved into the new premises on the first and first floors. The basic extension planned by Blaser Architekten provided for spatial adjustments to the existing structure. The toilet facilities on the 1st floor and in the gallery above were relocated to the access area in favour of contiguous office space. Existing offices were combined into open-plan offices and supplemented with focus rooms and a cafeteria. Within the existing glass tower, the offices of the CEO and his assistants as well as a personal meeting room were created by extending the podium and installing an all-glass wall.

Project information

  • GV SIA 416 m3
  • 3'617
  • GF SIA 416 m2
  • 984
  • Nutzfläche m2
  • 766
  • Fotografie
  • Beat Eichrodt

Fachplanung

  • Statik
  • Ulaga Weiss AG
  • Elektro
  • Pro Engineering AG
  • HLKK
  • herrmann & partner Energietechnik GmbH
  • Sanitär
  • Sanplan Ingenieure AG
  • Bauphysik
  • Gartenmann Engineering AG
  • Schadstoffe
  • Carbotech AG
  • Brandschutz
  • A+F Brandschutz GmbH

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Refurbishment of a commercial building in a central location in Basel with extension of use to a residential and commercial building.

Aeschenvorstadt residential and commercial building

Refurbishment of a commercial building in a central location in Basel with extension of use to a residential and commercial building.

Blaser Architekten / Butscher Architekten realised the office and laboratory building on the Novartis Campus as local architect for the design architect Rahul Mehrotra.

Novartis Campus WSJ-182

Blaser Architekten / Butscher Architekten realised the office and laboratory building on the Novartis Campus as local architect for the design architect Rahul Mehrotra.

Communication zone with wooden seating

Bright Peak Thera­­peutics

Installation of laboratory and office space for the young biotechnology company Bright Peak Therarpeutics on the Main Campus in Allschwil.

Conversion of the listed market hall site from 1928/29 with domed building and peripheral buildings.

Market hall

Conversion of the listed market hall site from 1928/29 with domed building and peripheral buildings.

Refurbishment of a residential building with newly constructed duplex flats on the top floor.

MFH Burgunder­strasse

Refurbishment of a residential building with newly constructed duplex flats on the top floor.

Refurbishment of a high-quality restaurant with replacement extension in the village centre of Riehen.

Landgasthof Riehen

Refurbishment of a high-quality restaurant with replacement extension in the village centre of Riehen.

Complete refurbishment of Credit Suisse building with bank branch on the ground floor and offices, residential units on the upper floors.

Credit Suisse Claraplatz

Complete refurbishment of Credit Suisse building with bank branch on the ground floor and offices, residential units on the upper floors.

New location for the SSEF (Swiss Gemmological Institute) with spacious, state-of-the-art laboratories.

Stiftung Schweizer­isches Gemmolo­gisches Institut

New location for the SSEF (Swiss Gemmological Institute) with spacious, state-of-the-art laboratories.

Installation of a Ferrari-Maserati garage in existing shed halls.

Ferrari Maserati garage

Installation of a Ferrari-Maserati garage in existing shed halls.

old flat with wooden floor

Claragraben flat

Gentle refurbishment of an old flat with access to the courtyard garden.