Competition for the clarification of future potentials and the development of the external space of EuroAirport Basel-Mulhouse.

EuroAirport rail link competition

Saint-Louis Cedex
Industry/Commercial
Text Link

Competition for the clarification of future potentials and the development of the external space of EuroAirport Basel-Mulhouse.

  • Client
  • Flughafen Basel-Mulhouse
    Flughafen Basel-Mulhouse
  • Location
  • Saint-Louis Cedex
  • Mandate form
  • Architecture
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Study/Competition
  • Duration
  • 04.2012
    —heute
    —09.2012
    0 Days
EuroAirport rail link competition

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

EuroAirport rail link competition

The tri-national EuroAirport Basel-Mulhouse is to receive a direct rail connection for passengers from France, Switzerland and Germany in the coming years. The access and car parking situations are also to be improved. The study is also intended to highlight the future potential of the outdoor space and the development of the EAP.

Blaser Architekten, together with a competent team of specialist planners, developed a proposal for the future design of the airport area. The tracks and platforms of the new railway are to be so low that they can be completely covered by a new level. It will serve as a platform for all arrivals and departures and will also function as a multimodal platform (public transport, drop-off, short-stay parking, taxis, shuttles, rent-a-car). The roof reflects the passengers' movements and adapts to the functional requirements. The result is an organic form that creates an exciting interplay of light and shadow, of views and vistas. Playing on the platform with elements from the public space creates a new place for encounters and communication. The current borderline is symbolised by a pool of water that separates the two countries according to the current global situation without actually drawing a border.

Project information

Fachplanung

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Classroom

Limmattal Vocational School

New extension for the Limmattal cantonal school in Urdorf near Zürich due to the sharp rise in pupil numbers.

Installation of a multi-space office in a square floor plan with a formerly dark centre zone.

Novartis Campus WSJ-360 5. OG

Installation of a multi-space office in a square floor plan with a formerly dark centre zone.

Blaser Architekten / Butscher Architekten realised the office and laboratory building on the Novartis Campus as local architect for the design architect Rahul Mehrotra.

Novartis Campus WSJ-182

Blaser Architekten / Butscher Architekten realised the office and laboratory building on the Novartis Campus as local architect for the design architect Rahul Mehrotra.

Installation of a travel agency for Hotelplan AG with an atmospheric ambience.

Travel agency Travel Mart

Installation of a travel agency for Hotelplan AG with an atmospheric ambience.

Neue Büroräume mit Blick aus dem Fenster auf die Basler Altstadt

University building

Staged conversion of a commercial building in the historic centre of Basel for use by the University of Basel.

Since summer 2016, you can complete a full workout in 20 minutes using the new EMS (electronic muscle stimulation) training programme at Grenzacherstrasse 62 in Basel.

Bionic Training

Since summer 2016, you can complete a full workout in 20 minutes using the new EMS (electronic muscle stimulation) training programme at Grenzacherstrasse 62 in Basel.

Replacement construction of an apartment block in the conservation zone.

MFH Lindenhof­strasse

Replacement construction of an apartment block in the conservation zone.

Addition to a detached single-family house with a separate pavilion in timber construction.

SFH Laufen

Addition to a detached single-family house with a separate pavilion in timber construction.

Work table with children's toys

Rear building Austrasse

Remodelling of a former workshop building in the rear courtyard and usable space in the front building for Heime Auf Berg AG.

New construction of a spacious detached house with a view of the Passwang.

SFH Himmelried

New construction of a spacious detached house with a view of the Passwang.