Work table with children's toys

Front and rear building Austrasse 32

Basel
Health
Text Link
Residential
Text Link

Remodelling of a former workshop building in the rear courtyard and usable space in the front building for Heime Auf Berg AG.

  • Client
  • MIREST Pensionskasse
    MIREST Pensionskasse
  • Location
  • Basel
  • Mandate form
  • Architect
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Conversion/Renovation
  • Duration
  • 09.2021
    —heute
    —07.2023
    0 Days
Front and rear building Austrasse 32

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Front and rear building Austrasse 32

Blaser Architekten were commissioned by the owner of the rear building at Austrasse 32 in Basel to draw up a study on how the former 3-storey workshop building could be converted into residential accommodation and then rented out, and an ideal tenant was found in the form of the Seltisberg-based institution 'Heime Auf Berg AG'. The institution offers a unique range of care and support services for infants, children, adolescents, women and families in difficult situations in north-west Switzerland. The NPO has 140 residential and care places at various locations in the cantons of Basel-Landschaft and Basel-Stadt.

Blaser Architekten converted the rear building, a former carpenter's workshop that was converted into a residential building in 1977, into living and working spaces for the purpose of family care on behalf of the Mirest pension fund (Tozzo Group). The mezzanine floor and the ground floor flat in the front building with access to the rear courtyard were also converted.

Project information

  • GV SIA 416 m3
  • 840
  • GF SIA 416 m2
  • 301
  • Nutzfläche m2
  • 250
  • Nutzer:in
  • Heime Auf Berg AG
  • Fotografie
  • Michael Fritschi

Fachplanung

  • Statik
  • Beurret Degen Ingenieure AG
  • Sanitär
  • Festa Engineering GmbH
  • Bauphysik/Akustik
  • Ehrsam Bauphysik AG
  • Schadstoffe
  • Carbotech AG

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Development and construction of a project for the Resort Andermatt Swiss Alps.

YARA Apartment House

Development and construction of a project for the Resort Andermatt Swiss Alps.

Local Architect for the design architect Riken Yamamoto for the project phases preliminary project to tender for the largest building construction project in Switzerland.

The Circle at Zürich Airport

Local Architect for the design architect Riken Yamamoto for the project phases preliminary project to tender for the largest building construction project in Switzerland.

Modernisation with extension of use following successful neighbourhood planning procedure.

Residential and commercial buildings Unterdorf

Modernisation with extension of use following successful neighbourhood planning procedure.

Chemgineering's tenant change within the buildings of Spenglerpark Münchenstein.

Chemgineering

Chemgineering's tenant change within the buildings of Spenglerpark Münchenstein.

High-bay warehouse of the paint manufacturer Caparol

Production and Sales point Caparol

Tenant change of the paint manufacturer Caparol into an existing business and commercial property.

Installation of a beach hall under the bridgehead of the Luzernerring bridge in St. Johann, Basel.

Beach volleyball and soccer hall

Installation of a beach hall under the bridgehead of the Luzernerring bridge in St. Johann, Basel.

Installation of the first Superdry shop in Switzerland.

Superdry Shop

Installation of the first Superdry shop in Switzerland.

Renovation of the building envelope of an apartment block with enlargement of the balcony areas.

MFH C.F Meyer-Strasse 54

Renovation of the building envelope of an apartment block with enlargement of the balcony areas.

The success of the competition in collaboration with Grafton Architects from Ireland has laid the foundation stone for the future university quarter.

Dreispitz university quarter study contract

The success of the competition in collaboration with Grafton Architects from Ireland has laid the foundation stone for the future university quarter.

Installation and conversion work for Medartis AG at its headquarters in Stücki Park Basel.

Medartis expansions

Installation and conversion work for Medartis AG at its headquarters in Stücki Park Basel.