Study to clarify the development options, taking into account the zoning-compliant use in comparison with a use that requires a neighbourhood plan.

Study contract for the Bricks area

Allschwil
Office/Administration
Text Link
Leisure/Culture
Text Link

Study to clarify the development options, taking into account the zoning-compliant use in comparison with a use that requires a neighbourhood plan.

  • Client
  • Losinger Construction AG
    Losinger Construction AG
  • Location
  • Allschwil
  • Mandate form
  • General planner
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Study
  • Duration
  • 08.2010
    —heute
    —10.2010
    0 Days
Study contract for the Bricks area

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Study contract for the Bricks area

The aim of the study was to clarify the development options on the Bricks site, taking into account the zoning-compliant use in comparison with a use that requires a neighbourhood plan. The neighbourhood plan variant proved to be more profitable. The urban development concept is based on the consideration of the four key functions: Working, living, recreation and transport.

Two new volumes will be placed on Binningerstrasse, defining the new 'gateway' to the site and opening it up to the residents (settlers). Car traffic (commuters) can be channelled through the parallel 'pit lane'. Orthogonal to Binningerstrasse, a primary traffic axis is created along which the cubatures are lined up and on which pedestrians and motorists are deliberately guided into the site at different levels.

The building density gradually decreases as you enter the site, so that the square in the southernmost part can be left open and the existing green belt can be experienced in its current dimensions. The plan is to structure the development into a basic level, where SMEs, shops and production companies can be located, and a pedestrian-friendly platform (highline) above, from which the high-rise buildings (offices, flats) will rise.

Project information

Fachplanung

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

New replacement building with consistent floor plans and loft-like living character.

MFH Dornacher­strasse

New replacement building with consistent floor plans and loft-like living character.

Expansion of the Basel Technology Park in Stücki Park.

Technology Park II

Expansion of the Basel Technology Park in Stücki Park.

Conversion and extension of a shop in the centre of Basel.

Boutique Interio

Conversion and extension of a shop in the centre of Basel.

Installation of open space offices for a clinical research organisation in the premises of the old stock exchange in Basel.

Alte Börse

Installation of open space offices for a clinical research organisation in the premises of the old stock exchange in Basel.

Classroom

Limmattal Vocational School

New extension for the Limmattal cantonal school in Urdorf near Zürich due to the sharp rise in pupil numbers.

Chemgineering's tenant change within the buildings of Spenglerpark Münchenstein.

Chemgineering

Chemgineering's tenant change within the buildings of Spenglerpark Münchenstein.

Two-stage refurbishment and upgrading of a detached house from the 1970s.

SFH Binningen

Two-stage refurbishment and upgrading of a detached house from the 1970s.

Single-storey detached house with studio on the edge of the building zone in Witterswil.

SFH Witterswil

Single-storey detached house with studio on the edge of the building zone in Witterswil.

Addition to a detached single-family house with a separate pavilion in timber construction.

SFH Laufen

Addition to a detached single-family house with a separate pavilion in timber construction.

Refurbishment of a high-quality restaurant with replacement extension in the village centre of Riehen.

Landgasthof Riehen

Refurbishment of a high-quality restaurant with replacement extension in the village centre of Riehen.